
Firewater Hydrant Pipeline Repairs
Assessment and rehabilitation of the firewater hydrant pipeline, mechanical repairs, reinstatement, pressure testing and confirmation of system…
Client: TotalEnergies • Service: Fire Protection Engineering
Project overview
Delivered for TotalEnergies at its Lube Warehouse in Kenya in 2024, this fire-protection scope restored the firewater hydrant pipeline to verified integrity.
Scope of work
- Assessment of the firewater hydrant pipeline
- Rehabilitation works
- Mechanical repairs
- Reinstatement
- Pressure testing
- Confirmation of system integrity
Engineering deliverables
- Rehabilitated hydrant pipeline
- Pressure test records
- System integrity confirmation
Related projects
Firewater Demand Assessment & Hydraulic Modelling — Petroleum Terminal
Mombasa, Kenya • Confidential client — petroleum terminal operator
Maximum water demand study, ring-main hydraulic model, pump duty verification and storage sizing for a coastal petroleum storage terminal.
View projectLPG Storage & Cylinder Filling Facility — Design & Documentation
Athi River, Kenya • Confidential client — LPG marketing company
Complete engineering package for an LPG storage and filling plant: vessel layout, piping, filling manifold, safety systems and fire interface.
View projectTank Farm Transfer Piping Revamp — Inland Depot
Eldoret, Kenya • Confidential client — depot operator
Rerouted transfer headers, pump re-selection, surge checks and full as-built documentation for an inland petroleum depot.
View projectStop Guessing. Get It Engineered.
Send drawings, BOQs or site photos — get a scoped proposal with deliverables, timeline and fee within 2 business days.
