
Firefighting Hydraulic Study — Changamwe LPG Depot
Field assessment, flow review, hydraulic modelling and evaluation of firewater demand, storage, pumps, hydrants and monitors, followed by engineering…
Client: TotalEnergies • Service: Fire Protection Engineering
Project overview
Delivered for TotalEnergies at the Changamwe LPG Depot in Mombasa: a field-based firefighting hydraulic study of the depot firewater system.
Scope of work
- Field assessment
- Flow review
- Hydraulic modelling
- Evaluation of firewater demand
- Evaluation of storage, pumps, hydrants and monitors
- Engineering recommendations
Engineering deliverables
- Field assessment report
- Hydraulic model
- Demand and system evaluation
- Engineering recommendations
Related projects
Firewater Demand Assessment & Hydraulic Modelling — Petroleum Terminal
Mombasa, Kenya • Confidential client — petroleum terminal operator
Maximum water demand study, ring-main hydraulic model, pump duty verification and storage sizing for a coastal petroleum storage terminal.
View projectLPG Storage & Cylinder Filling Facility — Design & Documentation
Athi River, Kenya • Confidential client — LPG marketing company
Complete engineering package for an LPG storage and filling plant: vessel layout, piping, filling manifold, safety systems and fire interface.
View projectTank Farm Transfer Piping Revamp — Inland Depot
Eldoret, Kenya • Confidential client — depot operator
Rerouted transfer headers, pump re-selection, surge checks and full as-built documentation for an inland petroleum depot.
View projectStop Guessing. Get It Engineered.
Send drawings, BOQs or site photos — get a scoped proposal with deliverables, timeline and fee within 2 business days.
